Improvement of Staff Quarters in wayside station with Provision of Hand Tube well, 2] Provision of Individual overhead PVC Tank in type II, III and IV staff quarters, 3] Extension of Platform Shelter for PF No. 1, 4] Augmentation of water supply with Provision of One no Deep Tube well and RCC Tank with pipe line at ADTP Settlement, Provision of Deep Tube well with Pipe line and One PVC Tank, 5] Construction of Pucca Side Drain in cutting and Retaining wall, 6] Conversion of Aqua privy into septic tank and Sewer line, 7] Erecting and Fixing of height gauge at level crossing in replacement of existing one, 8] Construction of Quarters in replacement of existing condemned type Quarters, 9] Provision of Deep Tube well and PVC Tank, 10] Raising of Both UP and Down Platform, 11] Extension of Water way of bridge, 12] Construction of Transit Type Quarters for doctors posted, 13] Construction of Quarters, 14] Provision of 5 Bays PF Shelter on PF No. 4 and 5 and Provision of Chequered tiles of both sides of PF and provision of kota stone under covered shed, 15] Construction of Boundary wall, 16] Provision of Yard Drain, 17] Construction of New Running room, 18] Construction of Front Courtyard wall for individual staff quarters, 19] Provision of Individual Overhead PVC Tank in staff quarters, 20] Execution of Miscellaneous works - Replacement of Existing Corroded GI Pipe line by new GI Pipe at Station, and replacement of Corroded Steel Gate of Existing P.S. Tank by New Steel Plates at station, 21] Provision of Individual Overhead PVC Tank, 22] Provision of RCC Overhead Tank, and On No Deep Tube well along with Provision of New Pipeline in staff quarters, 23] Provision of Washable Apron on PF no. 1 and 2.
Richiesta per le proposte
|