Ricerca

2.1.1 Pre-Design Studies, Detailed Design And Supervision Services (EXPIRED)

Richiesta di Espressione di Interesse

Informazioni generali

Tonga
   TO-MOH-449646-CS-QCBS
   14 Nov, 2024
25 Nov, 2024
  
Ministry of Health
   Inglese
   Altro
   pubblicato: 14 Nov, 2024

Le Informazioni Del Contatto

   Semisi Fukofuka
Ministry of Health
Ministry of Health, Taufa'ahau Rd, Tofoa, Tonga
Tonga
   +676 779 8614
   Clicca qui

Incarichi

Servizi di consulenza in ingegneria civile

Additional resources

Sommario

      

notice_summary_english: Detailed Design & Construction Supervision Services (DnS) for Tonga North Islands Group Healthcare Facilities
Reference No: TO-MOH-449646-CS-QCBS
The Ministry of Health (MoH) of the Kingdom of Tonga is expected to receive financing from the World Bank toward the cost of the Health Enhancement and Resiliency in Tonga Project (HEART) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the “Detailed Design & Supervision Services for Tonga North Islands Group Healthcare Facilities” to perform the following tasks in 3 Phases, but not limited to:
PHASE 1: Pre-Design Assessments & Studies for Northern Islands (Lump-Sum, 12 Months)
Master Planning 7+ hectares of the Prince Wellington Ngu Hospital (PWNH) site for the next 10 years of development;
Performing rapid and detailed assessments of 24 existing buildings at PWNH;
Preparing Environmental and Social due diligence documents for Project Component 2;
Assessing, planning, and preparing medical equipment/supply specifications and bid documents for PWNH and Northern Island CHCs and Nursing Clinics in Vava’u and Niua Island Group (6 facilities);
Assessing ICT and digital connectivity for PWNH and Northern Island CHCs and Nursing Clinic in Vava’u and Niua Island Group (6 facilities and including Vaiola Hospital in Nuku’alofa);
PHASE 2: Detailed Design of PWNH Hospital Facility (Lump-Sum, 15 months)
Providing detailed architectural and engineering studies, design, costings, plan, and prepare bid documents for a new 3600sqm hospital and new medical staff quarters at PWNH & the upgrade, retrofit, and/or strengthening of select existing buildings at PWNH;
Preparing Operations & Maintenance plans;
Providing Procurement Support;
PHASE 3: Construction Supervision and Monitoring of PWNH facility (Time-Based, not to exceed a maximum, 24 months)
Providing construction supervision and monitoring services for the development of PWNH.
The total level

Testo originale


More information: Clicca qui
Si prega notare che questo avviso e' soltanto a titolo informativo.
Pur impegnandoci a fornire informazioni quanto più accurate ed aggiornate disponibili sul nostro sito, non possiamo garantire che tutte le informazioni siano prive di errori.
Per aggiornamenti, correzioni o reclami su questo avviso, Vi preghiamo di contattare direttamente l'acquirente responsabile.